Commercial Gas & Heating

Gas Safety Certificate

Boiler Installations

Boiler Servicing

Boiler Breakdowns / Repairs

Power Flushing

Over a period of time there is likely to be a build up of solid deposits, such as chalk and limescale within the pipework and chambers of a central heating system. In addition, the presence of oxygen and chemicals in the water will cause a certain amount of corrosion of the metals which make up the system, producing ferrous oxides.
read more…

Pipe Work Commissioning

Testing and Purging up to 1m3 NG

Pipe Work NG

<

Air Heating

Overhead Plaque & Tube Heaters